![]() ![]() July 18 - 21: Re-Sealing of Visitor Center Parking Lots and Shared-Use PathĬlick here for a map of temporary closures ![]() No work is scheduled to occur on weekends or federal holidays. Minor noise disturbances should be expected in this area during construction. and 5 p.m., traffic delays of no more than 15 minutes should be anticipated along the Lodge Loop road. To improve the condition of roadways around the Bryce Canyon Lodge and Sunrise Point area, resurfacing work is scheduled to begin on June 15th and continue through September 15th. Construction Alerts June 15 - September 15: Lodge Loop Construction These two spur roads close after snow levels begin to require plow removal, but remain accessible for hikers, cross-country skiiers, and snowshoers. There are only two roads that are closed to vehicle traffic for the entire winter season (not currently in effect): the 1 mile (1.6 km) road leading to Fairyland Point and the 0.3 mile (0.5 km) road leading to Paria View. Along the first three miles of the main road, the Bryce Amphitheater area (which includes Bryce Point, Inspiration Point, Sunset Point, and Sunrise Point) is the first area to be plowed, so it remains accessible even during temporary closures of the scenic southern drive. Closures typically last a day or more, depending on snowstorm durations. For road conditions outside the park, visit įollowing snowstorms, the main park road closes temporarily at mile marker 3 to allow snow plow crews to clear snow from the higher elevations of the park's scenic southern drive. Check the Alerts above for current road conditions and closure messages. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |